{"id":90,"date":"2023-04-09T11:53:56","date_gmt":"2023-04-09T11:53:56","guid":{"rendered":"https:\/\/yarenergy.eu\/?page_id=90"},"modified":"2023-04-09T14:45:21","modified_gmt":"2023-04-09T14:45:21","slug":"servicii-de-constructie-a-parcului-fotovoltaic-cu-personal-calificat","status":"publish","type":"page","link":"https:\/\/yarenergy.eu\/en\/activitate\/servicii-de-constructie-a-parcului-fotovoltaic-cu-personal-calificat\/","title":{"rendered":"CONSTRUCTION SERVICES OF THE PHOTOVOLTAIC PARK WITH QUALIFIED STAFF"},"content":{"rendered":"<p>The construction of the solar park is the most important stage, representing the implementation of the technical project.<\/p>\n\n\n\n<p>We have teams and travel possibilities throughout the country.<\/p>\n\n\n\n<p>We have specialized staff for:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>recommending park subassemblies - especially panels and inverters - so that the quality\/price ratio is optimal for the customer's needs<\/li>\n\n\n\n<li>building the fence and the security system (perimeter protection and surveillance cameras);<\/li>\n\n\n\n<li>installing the metal structures that support the solar panels;<\/li>\n\n\n\n<li>installation of solar panels;<\/li>\n\n\n\n<li>installation of inverters and string boxes;<\/li>\n\n\n\n<li>installation of transformers;<\/li>\n\n\n\n<li>realization of interconnections of solar panels - inverters - transformers;<\/li>\n\n\n\n<li>putting into operation and connecting to the national energy system<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Constructia parcului solar este cea mai importanta etapa, reprezentand punerea in practica a proiectului tehnic. Noi dispunem de echipe si posibilitati de deplasare la nivelul intregii tari. Dispunem de personal specializat pentru:<\/p>","protected":false},"author":1,"featured_media":0,"parent":69,"menu_order":2,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-90","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/yarenergy.eu\/en\/wp-json\/wp\/v2\/pages\/90","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yarenergy.eu\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/yarenergy.eu\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/yarenergy.eu\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yarenergy.eu\/en\/wp-json\/wp\/v2\/comments?post=90"}],"version-history":[{"count":1,"href":"https:\/\/yarenergy.eu\/en\/wp-json\/wp\/v2\/pages\/90\/revisions"}],"predecessor-version":[{"id":91,"href":"https:\/\/yarenergy.eu\/en\/wp-json\/wp\/v2\/pages\/90\/revisions\/91"}],"up":[{"embeddable":true,"href":"https:\/\/yarenergy.eu\/en\/wp-json\/wp\/v2\/pages\/69"}],"wp:attachment":[{"href":"https:\/\/yarenergy.eu\/en\/wp-json\/wp\/v2\/media?parent=90"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}